Marine Instrument Equipment Development Quality Management Specification

A few days ago, in order to promote the application and productization of marine instrument equipment supported and developed in the field of marine technology in the 863 program, the quality control of the development process of marine instrument equipment (engineering prototypes and prototype prototypes) was strengthened, and sea trial operations and results evaluation were standardized. The 863 Plan Marine Technology The field office organization experts revised the "Quality Management Standards for the Development of Marine Instruments and Equipment" (Trial) and the "Standardized Maritime Testing Management Measures" (Trial) promulgated in 2008 and are now officially released.
863 Plan "Management Standards for the Development of Marine Instruments and Equipment" in the Field of Marine Technology

863 Plan "Standardization of Maritime Testing Management Measures" in Marine Technology

Passenger Elevator

Passenger Elevator,Elevator Lift,Passenegr Elevator

Gie Em Co., Ltd. , http://www.shelevatormotor.com