Full hydraulic tunnel prospecting rig :

1. Small size, light weight and easy installation.

2. Three major components. Main unit, pump station, console.

3. The original transportation, prospecting and roadway can be put into production, which will protect the overall structure of the mine. It can also be used for surface drilling.

4. The drilling rig is flexible in layout, mechanically twisting and unloading the drill pipe, reducing the labor intensity of workers and improving work efficiency.

5, the use of box-type feeding frame, clamp clamping, power head rotary drilling, cylinder pull drill, can save the bulky rig.

6, with linkage function, centralized operation through the console, simple and safe, can be stepless speed regulation.

7. Hollow shaft design, the length of the drill pipe is not limited by the drilling process. Can drill at any angle of 360 degrees.

8, good disintegration, easy to move and transport. The Φ33-Φ43 drill pipe can be used in the same machine, and the replacement takes only 15 minutes.

Single Tub Washer

Single tub washer

Yiwu Waterfilter Industry And Trade Co.,ltd , https://www.dancertrade.com