High Pressure Touchless Car Wash Machine High Pressure Touchless Car Wash Machine,Pressure Washer,Car Pressure Washer,High Pressure Car Washer Zhengzhou Shinewash Technology Co.,Ltd , https://www.shinewashtech.com
RFQ: Please provide 2D/3D Drawings for parts, Part Material, Part Weight
Mould Base
LKM, DME, HASCO etc
Cavity/ Core Material
1.2738,1.2343, 1.2344, S7, H13, P20HH, GS738H, LKM738H, 718, 8407, S136H, Calmax 635 NAK80, Â
SKD-61,NIMAX, 45#, 50#,Â
Steel Hardness
20-60HRC
Treatment
Pre-Harden, Nitride, Harden, Quenching
Cavity Qty
Single-cavity /Â Multi-cavity
Runner
Cold runner or Hot runner :YUDO/ HUSKY/MOLD-MASTER/SYNVENTIRE/INCO/ MASTIP/ HASCO/ DME
Gate
Sub gate, tunnel gate, side/edge gate, direct gate, pin point gate, sprue gate, diaphragm gate, fan gate, cashew gate, hook gate, hot tip, hot drop, valve gate etc.
Plastic material for parts
PS, SAN, PA, POM, ABS, PP, PET, PC, PE, HDPE, PA66+GF, PVC, TPE, TPU, TPV etc
Mould Life
30K -Â 1 million cycles
Design Software
UG, CAD, PRO-E, Solid Works etc,
Process
CNC, high speed carve, EDM ,wiring-cutting, drill, polish etc
Quality
TS16949:2009 Certified,SGS Certified
Lead Time
20-40 days depends on the structure and size of products
Package
Wooden Case Package or according to customer's requirement
Price Term
EX Works, FOB,CIF
Payment
T/TÂ
 ♦  ISO9001 certified
 ♦  10 years of experience in OEM/ODM products
Material
Aluminum, Steel,  ABS / PP / POM / stainless steel, Aluminum alloy,Brass, ABS,etc.
Surface Treatment
Polishing, Powder coating, Spraying, Anodizing, Zinc Plating and etc.
Tolerance
+/-0.02~0.05mm
Equipment
a) CNC Machining Center
b) CNC Lathes c) CNC Milling Machines d) Punching Machines e) Precision Cutting Machines f)CNC Bending Machine
Preferred Formats
JPEG,PNG,PDF,CAD,Art,STEP,IGS,UG,Solidwork
Preferred Industries
a)Communication  Equipment
b)Houseware c)Electric Components d)Automobile and Motorcycle Parts e)Other Customized Design
Product Show
Production Equipment
Application Range :
Household Appliance
TV, Air Conditioner, Washing machine, Microwave oven, Dust Collector,Â
Coffee maker, Hair drier etc.
Telecommunication
Telephone, Fax machine, Printer, Mobile, Router, Interphone etc.
Medical equipment
Diagnosis, Medical Trolley, Blood pressure monitor, sleep Apnea etc
Automotive
Accessory of bicycle, wheel, Motor, car etc.
Toys
Toys car, car model, toys helicopters, boats model, airplane model etc
COMPANY DESCRIPTION
1. We are factory providing CNC service for more than 10 years, specialized in stainless steel   mold and machinery components
2. Handling components of very tight tolerance and very complex geometry
3. Low MOQ (1pcs is even acceptable in some special conditions)
4. Sharp on time delivery
5. Top quality guaranteed by skilled workers, managing system and status of facilities.
6. Offering consultancy service on components machining
7. Customized size and spec /OEM available
Our company has strong technical force, advanced technical equipment, complete testing means and scientific quality management.
COMPANY INFORMATION
JunYi Metal & Plastic Mold Co., Limited
About our Company: was established Another shop in 2001. We have 2 shops, 1 for plastic mold making & plastic injection molding production. There are 5CNC machines, 8 EDM machines and 10 drilling machines for mold making. 15 sets injection molding machines from 60T to 500T. for short-run production, include metal & plastic prototyping by CNC machining, rapid tooling, such as aluminum soft tool and small quantity aluminum die casting + CNC secondary operation, silicone mold vacuum casting for plastic. There are 15sets CNC machines and 3 sets vacuum casting machines.Â
JunYi also provides outsourced service of sheet metal, sand casting & simple assembly with good quality and competitive prices.
Our company has strong technical force, advanced technical equipment, complete testing means and scientific quality management.
How to place an order?Â
1. Contact our sales staff to confirm the design and price.
2. Reach an agreement, then will send PI and please arrange payment.
3. Arrange the mold and samples to confirm the quality, mold will take about 25-40 days.
4. Production arranged after sample approved.
5. Take photos for the customer and arrange the balance payment.
7. Arrange shipment, by  UPS, or by air, by sea, will depend on the real situation.
8. Subsequent service.
Welcome you are coming to visit us and please feel free to send me 2&3D files for a quote:
Â
Runner: Cold Runner
Design Software: UG
Installation: Fixed
Certification: CE, ISO
Standard: DME
Customized: Customized
Transport Package: Wooden Case Package or According to Customer′s Req
Origin: China
Product Description
Steel info. (or expected
Â
mould life) & cavity etc.