Automatic Glass Screen Printing Machine,Automatic Horizontal Glass Screen Printing Production Line,Semiautomatic Screen Printing Machine For Glass Sheet,Silkscreen Printers For Glass,Automatic High Speed Screen Printer For Glass Lauer Water-Based New Material(Foshan)Co.,Ltd. , https://www.lauerink.com
In recent years, the popularity of urban landscape lighting should be felt by the manufacturers of outdoor landscapes. I think that with the development of urban landscape lighting in the next few years, the supply companies of urban landscape lighting or the related manufacturers will re-run. Integration. At present, some experts can also see that some experts are also opposed. Some people are also advocating media buildings. It can be said that the city is regarded as a big stage and the building is turned into a TV. This is a common phenomenon, but at the same time There is a problem with the city, and now almost all cities have created the landscape of the river and the river. Mianyang's one bank, the other side of the river, the two banks of Wuhan, the three banks of the three rivers in Ningbo, and almost all the cities in the city, all the buildings related to the river are brightened. This phenomenon can be said to be a bit visual to everyone. Fatigue is that every city will feel like a thousand cities. This is the first problem. The second question is that the time for the demonstration in the early stage of the project is too long, and the time left for the construction is too short. For the project like Xiamen, it will leave 45 minutes for the construction party and 20 billion for the construction; Two months to complete the 30 billion project, requiring lighting before the Spring Festival. Then the time left for construction is too short and should have some impact on the quality of the project. High development in the lighting industry is definitely a good thing. A normal industry or a healthy industry, its steady development is the most critical, but landscape lighting usually has such a big development, it will bring a lot of Hidden worry. â–² The first hidden worry is the trough behind the climax. This high-speed construction cannot exist for a long time. Perhaps for a city, a 35-year high-speed construction period for a government and a country will have a trough, so now The problem is that with the expansion of the project scale, there may be more than four companies with more than one billion projects in the engineering field, and the four are relatively conservative. The company controls the rhythm, including for the listing, but the scale of the engineering company. Years have broken the ceiling. At the same time, this phenomenon is recruiting. Now all engineering companies are facing the situation of insufficient staff, inadequate equipment and insufficient office space. Now some companies have 350,400 employees. What is brought about during the low tide period is a dangerous phenomenon. â–² The second worry is to maintain the problem of rising capital costs. Urban landscape lighting Previously, the city management department was only responsible for management functions. It was not invested in construction. Now it is government investment, but the work system will have this problem. After one-time investment by the government, these lights will be invested in the future for two years. The appearance of the area is broken, the failure is unsuccessful, and the phenomenon of no maintenance will have an impact on the entire industry. Once the project has a problem and does not follow up the repair, it has a negative impact on the entire lighting industry. Of course, the city management will also bring a lot of pressure, because after all, a project of 10 billion. After two years, various problems have arisen. If there is no maintenance, the negative impact is very high. If the management is good, the construction unit or the production unit is also facing great pressure. â–² The third point is the prevalence of media architecture. Since 1989, there has been a change in lighting every six or seven or seven or eight years. Now it is a popular form of media architecture. The way to change in the future is to install lights. There will be different morphological changes on the surface of the building where the place is not lit, so that after the entire building light is removed, it will bring visually bad daytime to all buildings along the river. This is a study worthy of serious study. problem. Finally, I have several suggestions: â— First, how landscape architecture uses multiple lighting methods. Media architecture can be done but it is temperate. It is impossible to link so many buildings in a city. I think it is feasible to do media construction in a lot of places in the business district. It is more popular in foreign countries to use projection projection. In this way, I think everyone can pay attention. â— Secondly, in order to avoid the sudden emergence of projects in the future, our engineering company will lay off people. I don't recommend engineering companies to recruit a lot of people. I suggest that engineering companies can cooperate with each other. In 2017, the engineering company has done a lot of cooperation. s project. â— Third, it is the management system and maintenance system that I have always emphasized. If an engineering company can undertake the management and maintenance after the completion of the project, it will play a good role in the future development. Operation and maintenance will survive in the future. In a business segment that goes down, companies should pay attention to the direction of diversified operations in the future.