The Shaanxi Rescue Team Arrive at Geermu's Missing Geological Team to Determine the Diesel Generator | Diesel Generator Price / 2012-03-08

Xi'an On March 8, according to the disappearance of three geological members, 17 days have passed. On the 7th, at 22 o'clock in the evening, the Shaanxi Provincial People's Rescue Team set off from Xi'an and traveled to Xi'an to Golmud for nearly 40 hours, and rushed to the search and rescue line of the Weihe River overnight.
It is reported that 16 members of the Shaanxi Provincial Civilian Rescue Team drove on the 6th and carried satellite communication phones, radio stations, and logistics supplies and other equipment from Xi’an to Kekexili. According to the plan, the rescue team first arrived in Golmud, and then went to Weihe after replenishing the equipment. Search and rescue headquarters, and unified arrangements to enter the frontline search and rescue operations.
Zhou Bin, a member of the Shaanxi Provincial Civil Rescue Team, said that in Hoh Xil, it is particularly important to maintain smooth communication with the outside world. Therefore, each search and rescue vehicle is equipped with a car radio station to ensure that the vehicles are connected before and after. If there are special circumstances, shortwave can also be used. Qinghai base contact.
The reporter learned from Golmud’s search and rescue headquarters in Qinghai Province that with the increase in search and rescue forces, the general orientation of the three missing players has been confirmed. The search and rescue methods for the pre-launching investigation will be changed to the vicinity of the Chibu Zhanguo Lake. Key search within the square kilometer range, where the connection between Chibundang Lake and Dorsault's Dong Cuo Lake has been designated as a water search area in the core area. At the same time, the search and rescue headquarters continued to interpret satellite images of the search and rescue area in order to find traces of missing persons.
According to Bai Linke, head of Golmud’s search and rescue headquarters, the next phase of search and rescue will face the challenge of increasing temperatures in the region. The melting of ice and the appearance of swampy land will bring great difficulties to the rescue vehicles.
Qi Wen, chief engineer of the Shaanxi Provincial Geological and Mineral Exploration and Development Corporation, stated that the search and rescue core area had 9 gales on the 6th. Therefore, in addition to the cold and oxygen deficiency, the relief work also needed to overcome new difficulties in visibility, and the search and rescue teams were slow. Move forward, but no information has been found on missing persons. (Finish)
Next:Installation, use and regulation of marine diesel generator sets
Previous: 58-year-old man "picked" when he fell in the car suspicious nervous heart failure

Mechanical Valve

Mechanical Valve, Electro Mechanical Valve, Mechanical Float Valve, Mechanical Flush Valve, Mechanical Joint Gate Valve

Fenghua QITE pneumatic&hydraulic Equipments Manufactory , http://www.qt-pneumatic.com