Drying equipment

After the successful operation of the coal gasification unit by the Anqing Petrochemical Fertilizer Division, the synthesis and urea plant quickly implemented various driving tasks. At the time, on March 29th, at the time of 22:00, urea was pelletized. At present, the urea plant is being tightened. Production, active service of spring plowing.

The major overhaul of the air separation and cold box of the Anqing Petrochemical Chemical Fertilizer Overhaul was the main contradiction line. It involved 15 major overhaul projects such as the overhaul of the K1301. The overhaul process involved a long span of time and the overhaul task was heavy. In order to ensure the successful operation of the device after major repairs, in line with the principle of “completely eliminating all hidden dangers and ensuring successful first-time driving”, employees are required to work together to fully prepare for driving, and earn seriousness for each part of the device before driving. The inspections, each of the valves of the device, and the operation of the pumps and key equipment, were conducted multiple hidden investigations before driving. At the same time, employees’ training work before the drive was carried out. On the basis of traditional skills training such as training and accident rehearsals, the accidental drilling of the abnormal working conditions in the production of "oil to coal" equipment was specifically targeted to effectively ensure the proficiency and accuracy of operation in the driving process.

Airless Lotion Bottle

Airless Lotion Bottle,Airless Lotion Pump Bottles,Airless Cosmetic Containers,Airless Cosmetic Packaging

Guangzhou Harvest Plastic Products Co., Ltd , https://www.fsharvestp.com