Hubei Cheng Li independently developed and manufactured sewage treatment truck, won the national patent, energy saving and environmental protection. Hubei



Chengli sewage treatment vehicle which configuration?

   

The basic configuration of the sewage treatment vehicle: sandwich power take-off, gear pump, multi-way valve, plunger motor, sewage discharge


Pump, water ring vacuum pump, shaftless screw, auger, suction pipe, motor, power distribution box, wire winch and other groups


Together.


The sewage treatment vehicle adopts Dongfeng Furuicha chassis with chassis configuration: 3.3m wheelbase, 7.00-10 nylon


Tire, 3 tons rear axle, 1.5 tons front axle, 5- speed gearbox and steam brake. The length of the vehicle is 5.995 meters wide


It is 1.99 meters and its height is 2.65 meters. The exterior of the sewage treatment vehicle is designed with 6 roll-open doors and 4 waste compartments. rear


Use double doors and LED advertising billboards for easy operation and promotion.


The model number of the sewage truck is CLW5040TWC4 , which can be used on the blue card and can be applied to domestic first-tier cities.


City work.



The conventional configuration of the sewage treatment truck: There are four 80 suction pipes , each 7 meters long, totaling 28 meters.


There is a roll of 100 meters of wire, the actual length is 95 meters, of which 5 meters for the distribution box to the motor and wire winding


Disk, the remaining 90 meters for connecting to external power.


Sewage vehicles use dual power, that is, if there is no external power supply, the owner of the vehicle can be used.


The machine operates; if there is an external three-phase power supply, it can be connected to the motor using the configured wires.


operation. As long as there is a power supply, it is better to use an external power supply to operate the motor, because the use of electricity is definitely better than using diesel.


The machine is cheap, and the wear of the motor is much smaller than that of the diesel engine. This allows the customer group to save most of the time.


The capital, which is also a major advantage of sewage treatment vehicles, can be mentioned in the promotion.


Sewage treatment vehicle operating process (working principle) : first get in and out of the suction pipe. Into the tube to be put


In a septic tank or a lagoon that needs to be disposed of, the discharge pipe should be placed on the sewer pipe nozzle or in an appropriate location.


If it is to use the host operation, first start the host that is diesel, when the barometer pointed to 6 bar



, Depress the clutch pedal; then open the switch of the PTO, then slowly release the clutch pedal


Board, so that the sewage treatment vehicle is in operation; then slowly pull the hand throttle cable to check the drive


The tachometer in the drive room controls the engine speed between 1200-1400 revolutions.



Why control between 1200-1400 rpm ? Because the car's sewage pump and vacuum pump speed


It is 1450 rpm, which is configured according to the rotation speed of the motor. The speed ratio of the center power take-off is 1:1.2 . and also


That is, when the engine speed reaches 1200 rpm, the sewage pump can reach a speed of 1440 . Engine such as


If the speed reaches 1400 , the sewage pump can reach a speed of 1680 , and more than 1400 rpm will exceed the sewage


The normal speed of the pump, so you need to control the engine speed between 1200-1400 , can not exceed


Can not be lower than this speed , low speed can not achieve the desired effect. The high speed is beyond the sewage pump and vacuum pump


Normal range may cause damage.


After the engine speed is controlled, open the multi-way valve. This multi-way valve is used to control the auger.


The non-shaft spiral of the surface can compress the sucked dirt and separate the water and the material.


The water comes out through the sewage pump. Dirt is discharged from the rear door of the chamber.


If you are using motor power, you need to connect the three-phase power supply. The three fire wires and the neutral wire must be connected because


Leakage protectors are installed in the power distribution box inside the vehicle and will automatically trip if there is an electric shock. Distribution box


There is also an anti-reverse protection device inside, which means that no matter how three-phase power is connected, it will not be reversed. Pick up


The power supply then plugs the power distribution box into the socket of the wire winch. Just connect the power supply, the power distribution box



The indicator will light, then press the switch button, so that the vehicle will enter the operating state, other operations with the



Host operation is the same.


Cheng Li Special Purpose Vehicle Co., Ltd. Wang Xinqun provided a friendship to learn more about Cheng Li’s new products or sewage


Processing vehicle information can be phoned. Manager of 18672222488 Wang. Fax: 0722-


3220988. Hope to be able to


Exchange to help you buy a car. You can also refer to Cheng Li’s designated sales website:


.


3 Series Hydraulic Control Manual Emergency Multi-way Valve

Hydraulic Proportional Directional Valve For Crane,Valve For Overhead Working Truck,Hydraulic Valve Used For Crawler Lorry,Psv Multiway Valve

Jiangsu KM Hydraulic Control System Co. Ltd. , https://www.km-valves.com