1. How to get a quotation? 5. What about the packing details? Automatic Thread Dispenser,Pre-Coating Threadlocker Adhesive,Full Automatic Thread Coating Machine,Internal Thread Coating Machine CIXI TIANHAO ELECTRIC CO.LTD , https://www.nbtianhao-auto.com
Product Attribute:
1. Precision turning part
2. Tolerance: ±0.01mm
3. Certificate: ISO 9001
4. Total customer satisfaction
Material can be carbon steel, stainless steel, alloy, aluminum, brass, copper, bronze, steel alloy, other type of materials.
Surface treatment: according to customer's request as polishing, zinc plating, hard anodizing, nickel plating, chrome plating, powder coating, phosphate coating, etc.
Our production can be made exactly according to customers' drawing. Very tight tolerance can be controlled to meet clients' requirement. All of the parts are manufactured under ISO 9001 certification and with strict quality control.8 engineers and 8 quality inspectors with advanced equipment making sure our productions delivered with high quality and making us a professional company in this industry.
Short delivery time meets your requirements
"Professional, sincere, sensitive, and responsible ".
Corporate profile
Currently,Wandaan brand products have a good reputation in the precision metal manufacturing industry with good quality,efficient service and reasonable price,are identified and adopted by ZTE,HUAWEI,NEC,RICOH,and other manufactures.
Equipments
Our company has more than 400 units of large-scale CNC Machining Center,computer CNC lathes,punching machines and all kinds of secondary processing equipments.
Working capacity: turning, boring, milling, drilling, reaming, tapping, etc; For auto lathe, Max turning OD:42mm, Max turning length:250mm, Max boring depth:42mm; Min machining accuracy:±0.01mm, common machining accuracy:±0.05mm; For CNC lathe: Max turning OD:180mm, Max turning length:650mm, Max boring depth:53mm; Min machining accuracy: IT6-IT7. Turning products could be widely used in communications, equipments, computer, power supplies, home appliances, medical and other fields.
Â
Inspection Equipments:
More details about delivery time, payment, tolerance show as the table below:
Item
Content
Details
1
material
aluminum, brass, bronze, copper, SUS, steel, alloy, pc, pvc, etc
2
finish
zinc plated, anodized, harden, polish, silk print, dusting, painting, passivation, etc
3
tolerance
turning                    ± 0.01mm
stamping                 ± 0.01mm CNC machining           ± 0.005mm
4
process
turning, Â Â machining, Â Â riveting, Â Â stamping, Â Â welding, Â grained, etc
5
package
PE + Carton
according to custome' s request
6
delivery date
sample: Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â 10-15days
goods:                    30days after receive the money single mode:              2weeks pregrossive die:            3weeks
7
quality control
IQC;  First item inspection;  IPQC / RQC;  FQC
8
payment
Paypal/Western union;  T/T,  L/CÂ
9
production capacity
stamping                        500000-1000000 pcs/mon
turning                          20000-50000  pcs/mon CNC maching                  10000-50000 pcs/mon secondary processing            50000-100000 pcs/mon
10
current sale scale
cnc maching parts      30%
stamping parts         30% turning parts           25% others                  15%
FAQ:
Please send us drawings in igs, dwg, step etc. together with detailed PDF.
If you have any requirements, please note, and we could provide professional advice for your reference
2. What if we do not have drawing?
Samples would be available, and we would send you drawing to confirm.Â
Of course, we would ensure the safety of the drawing.
 Â
3. How to pay?
For small quantity, we could provide Paypal, Paypal commission will be added to the order.
For the big one, T/T is preferred.
 Â
4. How to ship?
For small quantity, we have cooperation with TNT, FEDEX, UPS etc
For big quantity, air or sea would be available for you to choose.
We attached our normal packing details.
If you have any special requirements, we would be willing to help.
6. What about the delivery time?
It would be 20-30 days normally for the parts to be ready and we had a system to ensure the time.
When you made your order, you would know.